Water main – consists of pumping station and two pipes (approx. 8.km long) which would transport water from the Vistula River into the power plant’s cooling system, as well as the sewage water back into the river. Part of the pipeline runs through Natura 2000 sites Lower Vistula and Lower Vistula’s Valley.
High-voltage lines – will transmit energy from the power plant, approx. 6,5 (400 kV line) and 5,7 km (110 kV) long, they will cross valleys of river Wierzyca and Węgiermuca. The total width of the technical belt would be 155 m.
Internal road and railway system joining the power plant with public roads and railways; lighting of the area; drainage system.
Project’s name in Polish: Budowa Elektrowni Północ o mocy 2000 MWe koło miejscowości Rajkowy, gmina Pelplin, powiat tczewski w województwie pomorskim.
Location: Rajkowy, Pelplin municipality, Pomeranian voivodeship.
GPS coordinates: 18°43’E, 53°58’N.
Capacity: 2 x 800 MWe.
Number of units: 2.
Operation time: 35 years or more.
Total area: 328 ha.
Highest building: cooling towers, approx. 160 m.
Resources used
Hard coal: 3,65 million tons/year.
Light fuel oil: year one 6 950 tons, later 3 9500 tons/year (2 units).
Fuel oil: 1 800 tons/year.
By-products of coal combustion
Gypsum: 247 000 tons/year.
Ashes: 687 000 tons/year.
Slags: 78 000 tons/year.
Biocides used: 5 kg/day.
Sodium hypochlorite: 500 kg/day.
CO2 emissions: No data available, no less than 8 million tons a year.